Lake View Stormwater Drain
AST-2210 · Drainage · Ward 7 — North
high
Health score
53%
Risk score
78
Open complaints
9
Last inspected
2026-09-02
Condition trend (6 months)
Why this score
Silt accumulation reduces flow capacity by an estimated 38%.
Structural condition88
Citizen report density74
Traffic / usage load66
Weather exposure52
Linked citizen complaints
Waterlogging after light rain
In Review
CMP-8884 · S. Kulkarni · 2026-09-23 · AI confidence 89%
AI recommendation
Predicted failure window
Before next monsoon
Probability 74% · Estimated cost ₹68 L
De-silt entire stretch and add inlet screens.
See all predictions