Predictions

Model output comparing do-nothing degradation against the planned repair programme.

Model accuracy

87%

+4 pts after retrain

Assets at risk (90d)

23

Forecast spend

₹4.6 Cr

Avoided cost

₹11.2 Cr

if repairs start on time

City health forecast (6 months)
Predicted failures
AssetFailure windowProbabilityEst. costRecommendation
MG Road FlyoverAST-1041Within 45 days87%
₹2.4 CrSchedule joint replacement and load restriction immediately.
Lake View Stormwater DrainAST-2210Before next monsoon74%
₹68 LDe-silt entire stretch and add inlet screens.
Sector 9 Arterial RoadAST-3087Within 90 days66%
₹1.1 CrMill and overlay the 2.3 km worst-rated segment.
Riverside Water MainAST-4412Within 6 months51%
₹42 LDeploy acoustic leak sensors at three junctions.